Why did the Hyatt Regency walkways collapse?
The Hyatt Regency walkways collapsed in Kansas City on July 17, 1981, because critical connections between the suspension rods and the walkway box beams had insufficient load capacity. A change from continuous hanger rods to two separate sets of rods essentially doubled the load transferred through the fourth-floor connections. The investigation also found that the original connection design was inadequate. NBS report, pp. iii and vii; NIST summary.
The revision changed where the lower walkway’s load entered the upper assembly. That made an already deficient connection carry much more; it did not double every force in the structure.
Watch the explanation
Watch the episode for a visual explanation of the suspended walkways and the changed hanger-rod arrangement.
How the original load path was supposed to work
The second-floor walkway sat directly below the fourth-floor walkway. In the original arrangement, long hanger rods extended from the roof framing, passed through the fourth-floor box beams and continued down through the second-floor box beams. Nuts and washers supported each walkway at its own level. NBS report, p. iii and Figure 10.2.
The upper part of a continuous rod still carried the weight of both walkways. But the connection beneath the fourth-floor box beam only needed to transfer that upper walkway’s load into the rod. The lower walkway’s load entered the same rod farther down.
The route a force takes through members and connections to a support is its load path. Assemblies that look similar can send force through different parts.
What the two-rod arrangement changed
As built, one set of rods ran from the roof to the fourth-floor walkway. A second set hung the second-floor walkway from the fourth-floor box beams. These lower rods were offset along the box beams; they were not simply joined end to end to preserve the original continuous path. NBS report, p. 242 and Figure 10.2.
The lower walkway now pulled down on the fourth-floor box beam. The upper walkway’s connection to the roof-supported rod therefore had to transfer the load from both levels. The report describes this as an essential doubling of the load on the fourth-floor box-beam/hanger-rod connections. NBS report, p. 242.
The load passed from the lower walkway through its rod into the upper box beam, then through the upper connection to the roof-supported rod. Routing the lower walkway’s load through the upper box beam increased the demand on that connection.
Why the original connection also fell short
The National Bureau of Standards found that the original box-beam connection already fell short of the capacity required by the applicable building code. The altered arrangement increased the load on that deficient connection. NBS report, pp. iii and vii.
Investigators also concluded that the original continuous-rod arrangement would have carried the loads they estimated were present during the collapse. It could have survived that particular loading condition while still failing to meet the required design capacity. NBS report, p. vii.
The report identified insufficient connection capacity as the most probable cause and used damaged components to assess where failure likely began. It did not find material quality or workmanship to be a significant initiating cause. NBS report, pp. iii, vii and 242.
A connection revision requires recalculating the complete load path. A change made for fabrication can shift force to a different component even when the overall shape and the rods’ destinations look familiar.
The source record
National Bureau of Standards: Investigation of the Kansas City Hyatt Regency Walkways Collapse
NBSIR 82-2465 (1982) · Abstract p. iii; conclusions p. vii; section 10.5, p. 242 (PDF p. 258); Figure 10.2, p. 247 (PDF p. 263).
NIST: Walkway Collapse, Kansas City, Missouri, 1981
Official investigation summary · Box-beam/hanger-rod connection capacity and probable initiation location.